Planning of Jobs By Automatic Division Into Batch Sizes

In order to shorten the completion time of a job in production processes and optimize resource usage, jobs are automatically divided and scheduled among defined alternative machines. This feature allows the same job to be processed in parallel on multiple machines at the same time, significantly improving production times.
- Division with Alternative Machines: A job is automatically divided into batch sizes among the alternative machines defined for that job. This allows the job to be executed in parallel on multiple machines at the same time, reducing processing time.
- Production Time Optimization: By splitting jobs and processing them simultaneously on different machines, the total production time is significantly reduced. This saves time, especially with large batch sizes.
- Enabling Resource Usage: By using alternative machines, the workload is balanced and the idle times of the machines are minimized. Thus, capacity utilization is maximized.